MnDOT, the City of Glencoe and McLeod County partnered to improve the safety of intersections along Highway 212 and Highway 22, and to look at options for Highway 22 in the Glencoe area. The Transportation Study was completed in 3 phases from December 2018 – December 2019. The purpose of the study was to complete a transportation study that reflects the current and future transportation systems needs for the Glencoe area, develop a set of recommendations and review the local road network. We invite you to review the Transportation Study to learn more about the current and future of Glencoe Transportation!
Goals of the Transportation Study:
1. Improve the safety of intersections along Hwy 212 and Hwy 22.
2. Improve safety for pedestrians and bicyclists along Hwy 212 and Hwy 22.
3. Develop a plan that outlines appropriate access along Hwy 212 and Hwy22.
4. Study the current route of Hwy 22 in Glencoe.
City of Glencoe Transportation Study – Final Report
City of Glencoe Transportation Study – Executive Summary